Corrosion under insulation: finding the damage you can't see

Corrosion under insulation hides behind sound-looking cladding. Knowing where it forms and how to screen for it focuses inspection where it counts.

October 26, 2026

4 min read

KARR technical team
Corrosion under insulation: finding the damage you can't see
At a glance
  • CUI needs water, oxygen and a susceptible surface, and operating temperature strongly influences the risk.
  • Damage concentrates at penetrations, low points, damaged cladding and lines in intermittent service.
  • Visual checks, PEC, profile radiography and guided wave help decide where insulation should come off.
  • Good coatings, sealed cladding and careful reinstatement are the long-term defence against recurrence.

Corrosion under insulation is one of the most persistent integrity threats in process plants. Pipework and vessels can look perfectly sound from the outside while the steel beneath the cladding is thinning, pitting or cracking. Because the damage is hidden, it is often found only when insulation is removed for another reason, or when a leak appears.

The challenge for integrity teams is that insulation covers great lengths of pipe, and stripping it all is rarely practical or affordable. Finding CUI efficiently means understanding where it is likely to occur and using screening methods to direct the effort.

Why CUI happens

CUI needs water, oxygen and a susceptible surface. Insulation systems are designed to keep water out, but damaged cladding, failed sealants, poorly detailed penetrations and condensation all let it in. Once wet, the insulation holds moisture against the steel, sometimes for long periods.

Operating temperature plays a major part. Carbon and low-alloy steels are most at risk within a particular temperature band, where water is present but not driven off quickly, and equipment that cycles through that band or operates intermittently can be especially vulnerable. Austenitic stainless steels face a different threat, external chloride stress corrosion cracking, where chlorides from insulation or the environment concentrate on a hot surface. API RP 583 discusses these temperature ranges and mechanisms in detail and is a sensible reference for any CUI programme.

Coastal Gulf sites combine high humidity, salt-laden air and large daily temperature swings, which together increase the chance of moisture getting in and staying there. Cladding abraded by wind-blown sand and sun-degraded sealants add further entry points over time.

Where to look first

CUI is not evenly spread. It tends to concentrate where water enters or collects. Common susceptible locations include:

  • Penetrations: supports, nozzles, branch connections and instrument tappings where cladding is cut and sealed.
  • Low points: the bottoms of vertical runs, dead legs and areas where water drains and pools.
  • Damaged cladding: dents, gaps, missing bands and failed sealant, often near walkways and access points.
  • Steam tracing and deluge areas: places where water is regularly introduced or leaks occur.
  • Intermittent service: lines that cycle in and out of operation or spend time within the susceptible temperature range.

Screening methods

Screening helps prioritise where insulation should come off. No single technique finds everything, so most programmes combine several.

Visual inspection of the cladding is the starting point. Damage, staining, sagging and failed seals all indicate where water may be getting in. Thermal imaging can sometimes reveal wet insulation through differences in surface temperature.

Pulsed eddy current, or PEC, can measure average remaining wall thickness through insulation and cladding, which makes it useful for screening without removal. Profile radiography, including digital techniques, images the pipe wall profile through the insulation and can show localised wall loss. Guided wave testing can screen long lengths of pipe from a single position and is useful where access is difficult, though it indicates areas of concern rather than giving precise thickness values. Each technique has limits on pipe size, insulation type, temperature and sensitivity, which should be understood before its results are relied upon.

Targeted removal and follow-up

Screening tells you where to look; only removing the insulation tells you what you have.

Screening results, risk ranking and inspection history together define where insulation should be removed for direct examination. A practical approach is:

  1. Rank lines and equipment by susceptibility, using material, temperature, service and the condition of the insulation.
  2. Screen the higher-ranked items with suitable methods and record the results.
  3. Remove insulation at indicated locations, and at representative susceptible points, for direct visual and thickness inspection.
  4. Assess any damage against the operator's integrity procedures and fitness-for-service requirements.
  5. Repair, recoat and reinstate insulation properly, then update the inspection plan.

Prevention is the long-term answer

Finding CUI is only half the job. Protective coatings suited to the operating temperature, properly sealed cladding, well-designed penetrations and good drainage all reduce the risk. Some operators remove insulation where it is no longer needed for process or personnel protection, using guards instead. Insulation reinstated after inspection must be done to a proper standard, since poor reinstatement can create the next CUI problem. Recording what was found, and where, also helps refine the risk ranking for future campaigns.

A practical first step

Walk one insulated unit with a simple checklist of the susceptible locations above and note every point where cladding is damaged or poorly sealed. That walkdown often shows where a screening programme should begin. KARR's NDE team can help plan and carry out CUI screening and follow-up inspection.