End-to-end pre-commissioning for new onshore and offshore pipelines, from first cleaning run to a dry, validated line ready for commissioning.
Pre-commissioning is where a pipeline’s corrosion, flow and inspection baseline is set.
Pre-commissioning services for onshore and offshore new pipeline construction give your asset the best possible start-up, reducing corrosion, improving efficiency and helping prevent hydrate formation.
Pipeline integrity is validated by hydrotesting in compliance with international pipeline codes and specifications, allowing you to meet regulatory requirements before first product.
Each stage prepares the line for the next, and each is recorded for your integrity file.
Removal of construction debris and mill scale so later stages work as intended.
Confirmation that the bore is free of dents and obstructions before filling.
Controlled filling of the line with test medium, avoiding trapped air.
Pressure testing to validate integrity in line with international pipeline codes.
Removal of test water using pig trains and swabbing runs.
Drying the line to protect against corrosion and hydrate formation at start-up.
The order matters: cleaning before gauging, gauging before filling, dewatering before drying.
Debris out, bore verified.
Integrity validated to code and specification.
Test water removed with pig trains.
A dry, documented line ready for commissioning.
Practical notes from KARR engineers on pre-commissioning.
All pipeline insights →Cleaning, gauging, testing, dewatering and drying set a new pipeline's corrosion, flow and inspection baseline, and shortcuts taken at handover tend to resurface for years.
Most hydrotest delays come from planning gaps, not pipe failures; settle procedure, water, temperature, dewatering and records before the first pump starts.
Share your pre-commissioning scope and schedule. We will help you plan each stage and the records that go with it.